A forecast target connects a forecast to a policy. Your forecasting model describes future demand; the target turns that description into the one number a policy needs, such as an order-up-to level \(S\) or a reorder point \(s\). This page covers the theory, the three ways to supply a target, and how Stockcast keeps each target tied to the decision it was made for.

Definition

A replenishment decision at period \(t\) must cover demand over its protection window of \(H\) periods (\(H = L + R\) for periodic review; see Timing). Write the total demand over that window as

\[ D_{t}^{(H)} = \sum_{h=0}^{H-1} D_{t+h}. \]

The target at probability \(\alpha\) is its quantile, given what is known at the decision:

\[ S_t = Q_\alpha\!\left(D_t^{(H)} \,\middle|\, \mathcal{I}_{t-1}\right), \]

where \(\mathcal{I}_{t-1}\) is the demand history up to the previous period. The rest of this page covers how to compute \(S_t\) and pass it to Stockcast with its context.

Quantiles of sums

The quantile of a sum is not the sum of the quantiles:

\[ Q_\alpha\!\left(\sum_h D_{t+h}\right) \;\ne\; \sum_h Q_\alpha(D_{t+h}) \quad\text{in general.} \]

Quantiles add in special cases, such as when every day's demand is exactly the same as the first day's. With six independent days of Poisson(6) demand, the 95% quantile of the total is 46 while six daily 95% quantiles add up to 60 (Walkthrough step 3 shows the histogram). For sparse, intermittent demand the sum can be too low: with six independent days, each having a 4% chance of one unit of demand, every daily 95% quantile is 0, yet the 95% quantile of the total is 1. Stockcast therefore always works with the target of the whole window.

Computing the quantile of the total

Any forecasting model can give you \(S_t\). Choose the route that matches its output.

From sample paths

If the model can simulate future paths (bootstrap, Monte Carlo, a probabilistic neural network, a Bayesian posterior), the recipe is:

  1. draw \(M\) paths \(d^{(m)}_{t}, \dots, d^{(m)}_{t+H-1}\);
  2. sum each path: \(T^{(m)} = \sum_h d^{(m)}_{t+h}\);
  3. take the empirical quantile: \(S_t = Q_\alpha\bigl(T^{(1)}, \dots, T^{(M)}\bigr)\).
import numpy as np
import pandas as pd

paths = np.random.default_rng(0).poisson(6.0, size=(20_000, 6))   # from your model
target_value = np.quantile(paths.sum(axis=1), 0.95)
target_value
np.float64(46.0)

Paths carry the dependence between periods automatically. When you build paths by bootstrapping residuals, resample whole multi-period blocks so that dependence survives. See Build a target from sample paths.

From a cumulative forecast

Some libraries forecast the total directly. In smooth, for example, model.predict(h=H, interval="prediction", level=0.95, side="upper", cumulative=True) returns the upper bound of the cumulative forecast, which is exactly \(S_t\).

From means, standard deviations, and correlations

When demand over the window is approximately normal, its total has mean \(\sum_h \mu_h\) and variance

\[ \operatorname{Var}\!\left(D_t^{(H)}\right) = \sum_{h} \sigma_h^2 \;+\; 2\sum_{h<k} \operatorname{Cov}(D_{t+h}, D_{t+k}) = \mathbf{1}^\top \Sigma\, \mathbf{1}, \]

so

\[ S_t = \sum_h \mu_h + z_\alpha \sqrt{\mathbf{1}^\top \Sigma \mathbf{1}} . \]

Forecast errors are often positively correlated across horizons (a model that underestimates today tends to underestimate tomorrow). The covariance terms then make the window more variable than independent days would suggest:

from statistics import NormalDist

H, z = 6, NormalDist().inv_cdf(0.95)
mu, sigma, rho = np.full(H, 6.0), np.full(H, 2.0), 0.5

lags = np.abs(np.subtract.outer(np.arange(H), np.arange(H)))
cov = np.outer(sigma, sigma) * rho ** lags          # AR(1)-style correlation

target_independent = mu.sum() + z * np.sqrt((sigma ** 2).sum())
target_correlated = mu.sum() + z * np.sqrt(cov.sum())
round(target_independent, 2), round(target_correlated, 2)
(np.float64(44.06), np.float64(48.34))

When you are comfortable assuming independent normal days, Stockcast can do this sum for you (the independent-normal mode below). With correlation, compute \(S_t\) as above and pass it as a direct target.

Three ways to fit a target

Every fitted target records its probability, horizon, forecast origin, frequency, and end date. The fitting modes differ in what you supply.

The frequency is the policy's freq: the length of one period, such as "D" or "W-MON". It sits next to lead_time and review_period because they count periods of that length. With per-step forecasts (the independent-normal mode) you may leave it out: Stockcast reads it from the step dates when every SKU has at least three of them, evenly spaced on a daily, weekly, monthly, quarterly or yearly calendar (steps such as "2D" included). Day steps need a Saturday or Sunday among them when weekdays alone could just as well be business days: Monday, Tuesday, Wednesday could be daily or business-daily, and Monday, Wednesday, Friday could be "2D" or "2B". A one-row target has a single date per SKU, so it needs freq.

The date column of a forecast table is the last period each row covers: the window's last day for a one-row target, the step's own day for a per-step row. The forecast origin follows from it exactly, so you can leave out forecast_origin (give both and Stockcast checks they agree). A table with its dates in another column names it on the policy, next to the SKU column: OrderUpToPolicy(..., sku_column="item", date_column="end"). Per-step rows may also leave out fh when you give forecast_origin: each date tells its step.

One row per SKU with the target you computed:

from stockcast.policies import OrderUpToPolicy

opening_date = pd.Timestamp("2026-01-05")
target = pd.DataFrame({
    "unique_id": ["tea_250g"],
    "S": [target_correlated],
    "date": [opening_date + pd.Timedelta(days=6)],   # the last day it covers
})
policy = OrderUpToPolicy(lead_time=2, review_period=4, freq="D",
                         service_level=0.95, allow_backorders=False).fit(
    target, target_column="S",
)

One row per SKU and horizon step \(\mathrm{fh} = 1, \dots, H\), with the date of each step, a mean, and a standard deviation. Stockcast computes \(S = \sum_h \mu_h + z_\alpha \sqrt{\sum_h \sigma_h^2}\), which assumes the steps are independent; the target metadata records it as calculation_method="independent_normal":

steps = pd.DataFrame({
    "unique_id": "tea_250g",
    "fh": range(1, 7),
    "date": pd.date_range("2026-01-06", periods=6, freq="D"),
    "mean": mu,
    "std": sigma,
})
independent = OrderUpToPolicy(lead_time=2, review_period=4, freq="D",
                              service_level=0.95, allow_backorders=False).fit(
    steps, mean_column="mean", std_column="std",
)
independent.get_target_levels()
  unique_id  target_level
0  tea_250g     44.058104

Sometimes \(S\) is not a quantile at all: it comes from an optimiser, a planner, or a business rule. Leave service_level=None and omit the probability:

planned = OrderUpToPolicy(lead_time=2, review_period=4, freq="D",
                          service_level=None, allow_backorders=False).fit(
    target, target_column="S",
)
planned.get_target_metadata()["representation"]
'external_inventory_target'

The fit arguments

Argument Meaning Default and checks
target_column Column holding the target One finite, non-negative value per SKU
forecast_origin Last date of demand the forecast used Optional when the date column dates the rows; must not be after the first decision's information date; the window must end after the opening date
target_probability Probability \(\alpha\) the target represents Defaults to the policy's service_level; must equal it if given
protection_horizon Number of periods \(H\) the target covers Defaults to \(L + R\) for periodic schedules (must equal it if given); required for other schedules, checked as \((u - t) + L\) per decision

The table's columns are named on the policy: sku_column (default "unique_id") and date_column (default "date"), the date of the last period each row covers. For a one-row target that is the window's last period, origin \(+ H \Delta\); for a per-step row, its own period, origin \(+ \mathrm{fh}\,\Delta\). The default date column is read only when present; a named one must exist.

Column names that look like quantiles, such as q95, p90, up_95, or q975 (97.5%), are read as probabilities and must agree with the target's probability. A column called q90 cannot be passed as a 95% target by accident.

Targets over time

A target fitted at the opening date can be reused at every review: a static-target experiment, useful for isolating the effect of a policy setting. To refresh targets as new forecasts arrive, fit one policy per forecast origin and pass them as policy_schedule={decision_period: policy}. Each snapshot's origin must be the decision's information date, \(\text{opening date} + t\,\Delta\). See Refresh targets as forecasts roll and Notebook 04d.

When every decision must use a target fitted for it, pass allow_target_reuse=False to run: the run then stops before it starts if a decision would reuse an older target. rolling_schedule builds the schedule from one table of targets.

Target probability and realised service

The target probability describes the forecast: "with probability at least 0.95, demand over the window stays at or below \(S\)". Realised service in a simulation also depends on things the forecast does not know about: how accurate it actually is, the opening stock, lost sales, expiry, order minimums, and supplier reliability. The evaluator measures what the whole system delivers (Evaluation and metrics); comparing it with the target probability shows how well the forecast and the policy work together.

See also: Connect any forecasting model · Notebook 04e: three target methods